
Bathroom installation
Complete bathroom fit-outs, set out and installed properly the first time.
What’s included.
From first-fix pipework to the final bead of silicone, Bagno Technik installs complete bathrooms around the products specified for the space. Our installers work from the manufacturer’s guidance for each concealed frame, cistern, basin and shower valve, so the finished room performs as well as it looks.
Typical settings
- Private residences
- Hotel guestrooms
- Executive washrooms
- 01Setting-out and first-fix plumbing
- 02Concealed cisterns and in-wall frames
- 03Wall-hung sanitaryware, basins and vanities
- 04Taps, mixers and thermostatic showers
- 05Pressure testing, sealing and handover



From survey to aftercare.
The same five steps apply to every job, whatever its size.
- 01
Survey
We visit the site, measure accurately and check the existing water, drainage and wall conditions.
- 02
Specify
Products, fixings and method are agreed with you, your designer or the IL Bagno team.
- 03
Install
Trained installers fit each product to the manufacturer’s guidance and keep the site tidy.
- 04
Test & hand over
Every connection is pressure-tested and commissioned before a walkthrough with you.
- 05
Maintain
Aftercare, repairs and planned maintenance keep everything working as intended.



